Work is started on my Ripple Effect tile mosaic mural!
November – I had the aluminum frame corners welded and then I finished welding the structural supports and channel to the frame.
December – I cut the substrate to size and mortared mesh onto all of the edges. Next, I drilled holes into the aluminum frame and bolted the substrate to the frame.
The design cartoon is transferred and now I am ready to start laying the tile for the mosaic mural!
Comments